Brit Systems were appointed as the electrical contractor for the 2019 Headingley Stadium Redevelopment project in Leeds.

Project Challenges

Challenges we overcome

  •  Maintaining heating & ventilation throughout the works
  •  Complex construction environment including demolition of existing stands
  •  Being a Bradford Bulls fan
Visit Website
BL0Q4004_1600x915-aspect-ratio-825-725

Project overview

Brit Systems were given the brief to construct the North and South stands.

The redevelopment of Headingley Stadium was part of The Yorkshire County Cricket Club’s ambitious plans to transform Emerald Headingley Cricket Ground into one of the finest cricket venues in the world. Their plan is to complete the project in a phased redevelopment of the ground over the next 20 years. 

 

This plan includes the installation of floodlights and the rebuilding of the North/South Stand. The capacity of the cricket ground will increase from 17,000 to 20,000 in the redevelopment.

 

Brit Systems were given the brief to construct the North and South stands. Our solution to this brief was to install the BMS control system across the stadium. We also installed Fibre Optic networks and multiple plant rooms.

 

Here at Brit Systems, we enjoy a challenge and this project came with a few hurdles. One such challenge was that we had to adjust to working in a complex construction environment which included the demolition of existing stands. To overcome this issue we designed systems to streamline the installations. We also had to maintain heating and ventilation throughout the works due to the environment of the installation.

 

Another challenge we came across was that half of our team working on the project are Bradford Bulls fans. We set our differences aside and constructed the North and South stands of Headingley stadium ready to watch the Bradford Bulls win against Leeds Rhinos. 

 

Because of the phased nature of the project we showcased our ability to work to strict time scales, with our past experience in completing BMS and fibre optic networks to a mass-scale we were able to meet these deadlines and achieved client satisfaction and approval on the overall project. 

Download Case Study

Achievements

Project Results

1

Designed systems to streamline the installation

2

Client satisfaction & approval

3

Works completed within set strict timescales

results-project-aspect-ratio-1920-1060

You’re in safe hands

Don't take our word for it, see what our clients have to say

Chris and his team at Brit Systems are a pleasure to work with and the service we receive from them is excellent. They adopt a professional and collaborative approach whilst maintaining high levels of attention and detail towards their work even under tight programme constraints; a common scenario in our role as a BMS specialist!

Steve Collins

Brit has always provided a 1st class service, ensuring that all works are completed efficiently and effectively and that we as clients are kept up to date with progress. The procedures you have in place make my life easier in running our projects.

Adam Metcalf

We can always rely on Brit Systems to carry out their installations to the highest quality with a positive pro-active approach and have no hesitation in employing them whenever there is an opportunity.

Contractor

Brit Systems have worked with Westminster Controls for the last 5 years on a number of key projects across the UK. They have worked with us on projects ranging from Hospitals and Universities to grade 2 listed buildings and major office refurbishments, including working on Channel 4’s new Leeds HQ at the Majestic in City Square.

Adam Metcalf

Work With Us

Providing Reliable Building Service Automation Solutions

Newsletter Sign Up