Provide a BMS installation to new state of the art college facilities in central Leeds

Project Challenges

Challenges we overcome

  • City centre location & occupied areas
  •  Multiple control panels and systems
  •  Phased works & construction constraints 
Visit Website
DANCE-aspect-ratio-825-725

Project overview

In 2020, Brit Systems were appointed as the electrical contractor for Leeds City College to provide the BMS installation to new state of the art college facilities in central Leeds.

Leeds City College is one of the largest further education institutions in the country with more than 20,000 students and is one of the biggest providers of apprenticeships regionally.

This project really excited us as it came with some challenges and obstacles for us to overcome as it was in a city centre location and had phased works and construction constraints.

We managed this by efficiently organising the project management of the BMS installation across multiple plant rooms. As well as the Installation of the BMS system we also had the following work to be carried out: FCU’s, AHU’s, and control panel modifications. We planned to install multiple control panels, FCU networks, external roof-mounted AHU’s, VAV’s, and multiple monitoring points exactly as the client wanted.

 

By planning this efficiently our engineers were able to complete all installations on time and snag free which was such a great achievement for such a large scale project with its constraints.

Download Case Study

Achievements

Project Results

1

Project completed on time snag free

2

Fully project managed

3

Successful partnership with M&E engineers

results-project-aspect-ratio-1920-1060

You’re in safe hands

Don't take our word for it, see what our clients have to say

Chris and his team at Brit Systems are a pleasure to work with and the service we receive from them is excellent. They adopt a professional and collaborative approach whilst maintaining high levels of attention and detail towards their work even under tight programme constraints; a common scenario in our role as a BMS specialist!

Steve Collins

Brit has always provided a 1st class service, ensuring that all works are completed efficiently and effectively and that we as clients are kept up to date with progress. The procedures you have in place make my life easier in running our projects.

Adam Metcalf

We can always rely on Brit Systems to carry out their installations to the highest quality with a positive pro-active approach and have no hesitation in employing them whenever there is an opportunity.

Contractor

Brit Systems have worked with Westminster Controls for the last 5 years on a number of key projects across the UK. They have worked with us on projects ranging from Hospitals and Universities to grade 2 listed buildings and major office refurbishments, including working on Channel 4’s new Leeds HQ at the Majestic in City Square.

Adam Metcalf

Work With Us

Providing Reliable Building Service Automation Solutions

Newsletter Sign Up