0113 450 3251

Get In Touch

172804078_10158759944728124_6922845104814153215_n-aspect-ratio-1920-855

Building management Systems

Unilever UK

Unilever UK Icon Download Case Study
172804078_10158759944728124_6922845104814153215_n-aspect-ratio-640-640

Retrofit and refurbish the existing ageing Building Management System installation

Project Challenges

Challenges we overcome

  •  Restricted timescales & shut down periods
  •  Complex control panel alterations & electrical installation
  •  Working environment challenges
Visit Website
WIOP-Home-2000x1125_tcm1252-526360-aspect-ratio-825-725

Project overview

Brit Systems were appointed as the electrical contractor for Unilever Uk to Retrofit and refurbish the existing ageing Building Management System installation.

Unilever work to create a better future every day, with brands and services that help make sustainable living commonplace. With more than 400 brands bought in 190 countries, Britsystems were excited to be appointed contractor of choice for such a renowned company worldwide. 

Brit Sytems were approached by Unilever Uk in 2018, they provided a brief overview of what they required, making it clear that the work must be carried out outside their working hours. In order to meet the client’s restricted timescales, we carried out all of our works, out of hours and incorporated their Christmas shutdown period into our plan to ensure the work was completed on time with no issues. 

This installation consisted of multiple control panels, ageing plant equipment, and associated control peripherals which needed to be fully updated in line with current wiring regulations. Our experienced technicians serviced and maintained Unilever UK’s live systems and also produced a new functioning system that conformed with all current regulations.  

We believe our engineers were the perfect fit for this project and although complex, our team exceeded the client’s expectations and carried out the control panel alterations & electrical installation to the highest standards ensuring it was done right the first time.

Download Case Study

Achievements

Project Results

1

Completed on time snag free

2

Produced a new functioning system

3

Experienced engineers maintaining live systems

results-project-aspect-ratio-1920-1060

You’re in safe hands

Don't take our word for it, see what our clients have to say

Chris and his team at Brit Systems are a pleasure to work with and the service we receive from them is excellent. They adopt a professional and collaborative approach whilst maintaining high levels of attention and detail towards their work even under tight programme constraints; a common scenario in our role as a BMS specialist!

Steve Collins

Brit has always provided a 1st class service, ensuring that all works are completed efficiently and effectively and that we as clients are kept up to date with progress. The procedures you have in place make my life easier in running our projects.

Adam Metcalf

We can always rely on Brit Systems to carry out their installations to the highest quality with a positive pro-active approach and have no hesitation in employing them whenever there is an opportunity.

Contractor

Brit Systems have worked with Westminster Controls for the last 5 years on a number of key projects across the UK. They have worked with us on projects ranging from Hospitals and Universities to grade 2 listed buildings and major office refurbishments, including working on Channel 4’s new Leeds HQ at the Majestic in City Square.

Adam Metcalf

Work With Us

Providing Reliable Building Service Automation Solutions

Newsletter Sign Up